Pro Remodeling has chosen to remain open during our normal business hours during the current COVID-19 pandemic in order to meet the needs of our customers.  Pro Remodeling is following the Executive Order issued by Governor Doug Ducey on March 23, 2020 (EO-2020-12), listing essential services that should remain open: Critical trades, including contractors, plumbers, electricians, etc.

Rest assured all of our employees are observing the protocols of safety recommended by medical experts: wash hands frequently, avoid crowds, limit close contact with others, etc.  We will be diligent in following the measures set forth to ensure your safety as well as our own.

Tag: demolition

How Long Does a Kitchen Remodel Take?

Home improvement projects are exciting, and one of the most popular areas to update is the kitchen.

Kitchen remodels allow you to revamp your cooking space according to your updated needs and preferences. If you’re like most Tucson homeowners planning for this home improvement project, you might wonder, “How long does a kitchen remodel take?”

As the leader in kitchen remodeling in Tucson, AZ, our team at Pro Remodeling is here to explain the kitchen remodeling process and how long it takes.

The Typical Timeline for a Kitchen Remodel

While every job presents its own unique challenges, standard projects typically take between six to 12 weeks to complete once construction begins. 

However, various factors can extend the process, including:

  • Scope of the project: A minor renovation may take a few weeks, while a full-scale remodel with structural changes could take several months.
  • Material availability: Supply chain issues with custom or imported materials can delay progress.
  • Unforeseen challenges: Issues that you didn’t expect, like outdated wiring or plumbing, can arise during demolition.

Explore the Phases Your Project Will Go Through

How long does a kitchen remodel take? We’ve broken down the stages below:

  1. Planning and design (two to four weeks or more): The planning and design phase is where your vision takes shape. You’ll work with designers or contractors to finalize the layout, choose materials, and set a budget. Also, expect to make firm decisions about cabinetry, countertops, and appliances. 
  2. Permits and approvals (two to six weeks): If your project involves structural changes, plumbing, or electrical work, you’ll need to obtain the necessary permits. In and around Tucson, local regulations can influence how quickly officials provide approvals. 
  3. Demolition (one to two weeks): After getting the necessary permits, the physical renovation begins. The demolition phase includes removing old cabinetry, flooring, and fixtures. Issues like hidden water damage or mold can slow progress.
  4. Installation and rough-in work (three to five weeks): This involves installing plumbing, electrical systems, and framing for structural changes. Once the rough-in work is complete, officials must inspect the progress before the job proceeds further. 
  5. Flooring and cabinetry installation (three to six weeks): Flooring materials like tile or hardwood may require specific installation techniques. In addition, the contractor must install the cabinets before countertop fabrication can begin.
  6. Final touches and inspections (one to two weeks): Finally, the contractor adds fixtures, backsplashes, and hardware. Inspections ensure everything meets local codes. You and your contractor will discuss any small adjustments needed to complete the project.

Learn More About What To Expect With Pro Remodeling

Our experts at Pro Remodeling understand the importance of clear communication and efficient project management. With over 45 years of experience, we’ve perfected the art of delivering top-quality results while adhering to realistic timelines.  

How long does a kitchen remodel take? With careful planning and our expert guidance, you can see results in a reasonable timeframe. When you work with us, we’ll explain what kitchen remodel costs and timelines to expect so you’re always in the know.

Call our professionals at Pro Remodeling at (520) 745-9769 to start your next home improvement project. 

Remodeling a Kitchen — What Comes First?

So, you decided you want a new kitchen. When remodeling a kitchen, what comes first? There are so many steps involved that it can be overwhelming, but the first thing is to plan everything.

Pro Remodeling, a kitchen remodeling company in Tucson, can help you with every part of the remodeling process. Give us a call to get the ball rolling.

The Planning Phase Comes First

When remodeling a kitchen, what comes first? Planning! You need to plan everything from costs to colors to contractors. Going in without a plan could backfire if something goes wrong.

Find Out Your Budget

Budgeting isn’t the fun part, but kitchens can get expensive quickly. Decide how much you can put towards a remodel, and be firm about a spending limit so you don’t spend more than you should. Budget as specifically as possible, down to the paint prices.

Choose a Layout

When remodeling a kitchen, what comes first, deciding what your new kitchen will look like, or picking the colors? If you want to make layout changes, you may need to plan to have pipes and electrical outlets installed or removed. Adding an island or bar could make a room feel cramped, so use a measuring tape during this part.

Consider the Upgrades

The best part of remodeling might be the kitchen upgrades. What appliances and organizational storage will you include? What brand of appliances will you choose?

Choose Your Colors

Indecision often revolves around colors. Collect the paint samples and try to figure out which combination is your favorite. Design planning is fun, but it can be tough!

The Fun Starts After Planning

When remodeling a kitchen, what comes first after planning? The order may vary, but it often looks like this:

  • Demolition: Break down walls and remove cabinets and floors. You can DIY this, but contractors may be safer.
  • Rough-in work: Get your plumbing, electrical, and gas installed by reliable contractors.
  • Inspection: Have an inspector check the rough-in work to ensure your home follows all local laws and codes. Poor craftsmanship may hurt you or your kitchen later.
  • Walls: Install new walls after the pipes and electricity wires are in place. Paint them to make the room look official. 
  • Doors and windows: Add doors and windows after installing the walls.
  • Fixtures and cabinets: Install the cabinets and add the kitchen sink.
  • Appliances: Set up your new appliances and get them plugged in and ready to go.
  • Flooring: When remodeling a kitchen, what comes first: flooring or cabinets? It can vary, but regardless, it’s the step that will tie everything together and make the remodel feel real.

Call Pro Remodeling Today

If you’re wondering, “When remodeling a kitchen, what comes first?” or you have questions about a kitchen remodel cost, give Pro Remodeling a call. We’re happy to help you start the exciting journey of a new kitchen. 

Pro Remodeling can handle every part of the process from demolition to flooring. If the thought of finding reliable contractors stresses you out, give us a call at (520) 745-7969 and we’ll get the process started. Talk to us today.