How Long Does a Kitchen Remodel Take?
Home improvement projects are exciting, and one of the most popular areas to update is the kitchen.
Kitchen remodels allow you to revamp your cooking space according to your updated needs and preferences. If you’re like most Tucson homeowners planning for this home improvement project, you might wonder, “How long does a kitchen remodel take?”
As the leader in kitchen remodeling in Tucson, AZ, our team at Pro Remodeling is here to explain the kitchen remodeling process and how long it takes.
The Typical Timeline for a Kitchen Remodel
While every job presents its own unique challenges, standard projects typically take between six to 12 weeks to complete once construction begins.
However, various factors can extend the process, including:
- Scope of the project: A minor renovation may take a few weeks, while a full-scale remodel with structural changes could take several months.
- Material availability: Supply chain issues with custom or imported materials can delay progress.
- Unforeseen challenges: Issues that you didn’t expect, like outdated wiring or plumbing, can arise during demolition.
Explore the Phases Your Project Will Go Through
How long does a kitchen remodel take? We’ve broken down the stages below:
- Planning and design (two to four weeks or more): The planning and design phase is where your vision takes shape. You’ll work with designers or contractors to finalize the layout, choose materials, and set a budget. Also, expect to make firm decisions about cabinetry, countertops, and appliances.
- Permits and approvals (two to six weeks): If your project involves structural changes, plumbing, or electrical work, you’ll need to obtain the necessary permits. In and around Tucson, local regulations can influence how quickly officials provide approvals.
- Demolition (one to two weeks): After getting the necessary permits, the physical renovation begins. The demolition phase includes removing old cabinetry, flooring, and fixtures. Issues like hidden water damage or mold can slow progress.
- Installation and rough-in work (three to five weeks): This involves installing plumbing, electrical systems, and framing for structural changes. Once the rough-in work is complete, officials must inspect the progress before the job proceeds further.
- Flooring and cabinetry installation (three to six weeks): Flooring materials like tile or hardwood may require specific installation techniques. In addition, the contractor must install the cabinets before countertop fabrication can begin.
- Final touches and inspections (one to two weeks): Finally, the contractor adds fixtures, backsplashes, and hardware. Inspections ensure everything meets local codes. You and your contractor will discuss any small adjustments needed to complete the project.
Learn More About What To Expect With Pro Remodeling
Our experts at Pro Remodeling understand the importance of clear communication and efficient project management. With over 45 years of experience, we’ve perfected the art of delivering top-quality results while adhering to realistic timelines.
How long does a kitchen remodel take? With careful planning and our expert guidance, you can see results in a reasonable timeframe. When you work with us, we’ll explain what kitchen remodel costs and timelines to expect so you’re always in the know.